A flagship project for the local energy transition
Small, smart and exactly what the energy transition needs: a solution that can be implemented in no time at all, from planning and approval right through to installation. Three parking areas, each with three integrated electric charging points and battery storage units, were fully installed within three days. From now on, motorists can park their vehicles there in the shade, sheltered from the weather, and get back in with peace of mind.
Project facts
- Duration: 3 days
- Parking spaces: 3
- Electric charging points: 3
- Power output: 8 kWp
UV Energy demonstrates how the local energy transition can be achieved – quickly, cost-effectively and with minimal land use, right on our doorstep.
Roland Bernhard, District Administrator of the Böblingen district
Solar car park – ideal for sealed surfaces
UV.energy’s modular PV car park power plant is an innovative photovoltaic canopy designed specifically for areas that are already sealed. The UV.carports combine a patented lightweight design – requiring just two supports per parking space – with integrated AC charging infrastructure and smart energy management. This makes UV.carports the foundation of a self-sufficient and independent local electricity supply.


Quick implementation without blocking car parks
The Synaptikon Schönaich project is a flagship project for the local energy transition.
In particular, the speed of construction and the straightforward approval process – made possible by the absence of civil engineering works and concrete foundations – as well as the ability to install UV.carports whilst operations continue, proved decisive and gave the project a whole new dimension.